Some Critical Elements of Engineering Project Management
DOI:
https://doi.org/10.16920/jeet/1992/v6i1/114546Abstract
A systematic and scientific approach to engineering project management is essential to ensure that the project objectives are fulfilled within the constraints of time, captial and other resources. This paper examines some critical elements of engineering project management, such as the Work Breakdown Structure (WBS), Gantt chart PERT/CPM, COST estimates and budgets, and project implementation and control. Effective use of these techniques, in an integrated systems approach to project management, will contribute significantly towards reducing cost and time over-runs in modern engineering projects.Downloads
Download data is not yet available.
Downloads
Published
1992-07-01
How to Cite
Iyer, P. P. (1992). Some Critical Elements of Engineering Project Management. Journal of Engineering Education Transformations, 29–32. https://doi.org/10.16920/jeet/1992/v6i1/114546
Issue
Section
Articles
Access to login into the old portal (Manuscript Communicator) for Peer Review-